From the request to handover

How a job moves

How deep each step goes depends on the number of processes and the people involved. Mapping the process can itself be a separate job, with a written result.

  1. 01

    Request

    Company, industry, the person to call, the problem, the units, a rough user count, and the programs in use.

  2. 02

    Meeting

    The main problem, today's method, the waiting, the result you want, and the constraints.

  3. 03

    Today

    Start and end of the work, roles, inputs and outputs, decisions, waiting, and the errors that repeat.

  4. 04

    Next

    Which step to remove or automate, and where a person's signature still has to stay.

  5. 05

    Whether it can be built

    Data volume, security, servers, connections, and whether a robot or a model is actually needed.

  6. 06

    Proposal

    Scope, what is deliberately left out, time, price, and the handover criteria.

  7. 07

    Contract

    Building starts after signature and the advance. One person on our side owns the project.

  8. 08

    The detailed plan

    Forms, data, flow, and, if needed, the agreement for connecting other programs.

  9. 09

    Build

    The work moves in pieces. Anything outside the scope is a change request.

  10. 10

    Test

    The right path, a bad input, a missing permission, and a failure in an outside service.

  11. 11

    Training and go-live

    The agreed data is moved, users are shown the work, and we watch the first days.

  12. 12

    Handover

    Handover means the written criteria were met. A new capability is estimated on its own.